首页> 外文期刊>Asian oil and Gas >Sapphire's turn to shine
【24h】

Sapphire's turn to shine

机译:蓝宝石闪耀

获取原文
获取原文并翻译 | 示例
           

摘要

The latest addition to Egypt's offshore I infrastructure was brought onstream I on 8 September by the project operations team onboard Fugro Survey construction support vessel Skandi Carla,whose two Triton XL work-class ROVs were deployed to turn the subsea valves and send Sapphire gas ashore.A grateful client,Technip Offshore UK,acknowledged the successful contribution made by the vessel in a note of thanks to Fugro.'We would like to thank all the personnel onboard the Skandi Carla for helping Technip achieve the first gas on schedule for Sapphire,' Technip Offshore's construction manager,Tony Forster stated.'Once again the Skandi Carla team have been involved in major milestones on this project which,without the help of the personnel onboard...would not have been possible.'
机译:项目运营团队于9月8日将Fugro Survey工程支持船Skandi Carla运用于埃及海上I基础设施的最新设施,该船部署了两艘Triton XL工作级ROV,以转动海底阀门并将蓝宝石气输送到岸上。感激的客户Technip Offshore UK在感谢Fugro的感谢信中确认了该船的成功贡献。“我们要感谢Skandi Carla船上的所有人员,帮助Technip按计划实现了蓝宝石的第一批加气,” Technip Offshore的施工经理Tony Forster说:“再次,Skandi Carla团队参与了该项目的重大里程碑,如果没有船上人员的帮助,这将是不可能的。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号