首页> 外文期刊>Asian oil and Gas >Turbocompressor trains for Tunu
【24h】

Turbocompressor trains for Tunu

机译:图努的涡轮压缩机火车

获取原文
获取原文并翻译 | 示例
           

摘要

Florence,Italy based GE Oil & Gas will supply Total E&P Indonesie with two gas turbine-driven turbocompressor trains for the Tunu field development project,phase two south,in the Mahakam Delta of East Kalimantan,Indonesia.The Tunu 11 project is designed to boost the delivery of natural gas from the Tunu field to the PT Badak LNG plant in East Kalimantan.Each of the GE turbocompressor trains will include a PGT25 gas turbine with an Lm~2500 dry low emissions(DLE)gas generator,gear box and 2BCL608 centrifugal compressor.The power turbine and compressor will be manufactured in Florence while the gas generator will be manufactured in Evendale,Ohio,USA.
机译:GE Oil&Gas总部位于意大利佛罗伦萨,将为Total E&P Indonesie提供两台燃气轮机驱动的涡轮压缩机系列,用于印尼东加里曼丹东部Mahakam三角洲第二阶段的Tunu油田开发项目。Tunu11项目旨在促进从Tunu气田向东加里曼丹的PT Badak LNG工厂输送天然气.GE的每台GE涡轮压缩机组都将包括一台PGT25燃气轮机,该燃气轮机配有Lm〜2500干低排放(DLE)气体发生器,齿轮箱和2BCL608离心机动力涡轮和压缩机将在佛罗伦萨制造,而气体发生器将在美国俄亥俄州的埃文代尔制造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号