首页> 外文期刊>Asian oil and Gas >Pluto LNG nearing completion
【24h】

Pluto LNG nearing completion

机译:冥王星LNG即将完工

获取原文
获取原文并翻译 | 示例
           

摘要

The huge Pluto LNG Project offshore Western Australia, now over 80% complete, has received a boost from a series of contracts at the end of 2009.Approved by Woodside in mid-2007, the development of the Pluto and Xenia gas fields in the Carnarvon Basin includes five subsea large bore wells producing to a shallow-water production platform 27km away. Gas will be transported from the fixed platform in an 85m water depth through 180km of pipeline to an onshore LNG plant at Dampier on the Burrup Peninsula. The initial single-train LNG processing facility, in the new Burrup LNG Park, will have a production capacity of 4.3mtpa, as well as an export jetty and storage facilities.
机译:西澳大利亚州海上大型Pluto LNG项目现已完成80%以上,已于2009年底获得一系列合同的推动.2007年中期,Woodside批准了Carnarvon的Pluto和Xenia气田的开发该盆地包括五口海底大口径井,这些井在27公里外的浅水生产平台上开采。天然气将从水深85 m的固定平台通过180公里的管道输送到Burrup半岛Dampier的陆上LNG工厂。最初的单列液化天然气加工设施位于新的Burrup液化天然气园区,将具有4.3mtpa的生产能力以及出口码头和储存设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号