...
首页> 外文期刊>Asia Oil and Gas Newsletter >Sino flows from Linxing PSC
【24h】

Sino flows from Linxing PSC

机译:临兴PSC的中国资金流

获取原文
获取原文并翻译 | 示例
           

摘要

Sino Gas & Energy Holdings reported today that a flow rate of 33.99 Mcm/d (1.2 MMcf/d) of gas has been achieved from an unfracced lower zone of the TB-26 test well in the Linxing Production Sharing Contract (PSC) in China’s Ordos Basin. A lower 4m (13ft) pay zone was perforated on TB-26 in the prospective northwestern portion of Linxing West. Flow testing conducted over four days achieved a stable flow rate of 33.99 Mcm/d (1.2 MMcf/d) at a relatively stable flowing tubing head pressure of 1,740psi.
机译:中国天然气能源控股集团今天报告说,在中国临兴生产分成合同(PSC)中,从TB-26测试井的无裂口下部区域获得的天然气流量为33.99 Mcm / d(1.2 MMcf / d)。鄂尔多斯盆地。在临兴西的西北部,TB-26上钻了一个较低的4m(13英尺)产层。经过四天的流量测试,在相对稳定的1,740psi的油管压头下,获得了33.99 Mcm / d(1.2 MMcf / d)的稳定流量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号