OMV has spudded the Whio-1 exploration well in PEP 51313 offshore New Zealand with the Kan Tan IV semisubmersible rig. The well has a planned total depth of 2,879m (9,445ft) measured depth below rotary table, and the well path will be deviated northwards from the surface location to avoid pos-sible shallow drilling hazards above the subsurface targets.
展开▼
机译:OMV使用Kan Tan IV半潜式钻机在新西兰近海的PEP 51313上勘探了Whio-1勘探井。该井计划在转盘下方测得的总深度为2,879m(9,445ft),该井路径将从地面位置向北偏离,以避免在地下目标上方可能出现的浅层钻井危险。
展开▼