...
首页> 外文期刊>Asia Oil and Gas Newsletter >Senex’s Cooper Basin progress
【24h】

Senex’s Cooper Basin progress

机译:老人的进步库珀盆地

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Senex Energy has reported strong progress with its projects in Australia’s Cooper Basin. The operator has strengthened its producing revenue base with the start of production from the recently discovered Martlet oil field in the Western Flank of the Cooper Basin. The field lies in PEL 104 (Senex 60% and operator, Beach Energy 40%). The Martlet-1 well flow tested at the equivalent of 5,149 b/d of fluid and 2,596 b/d of oil from the target Namur reservoir on a short term test.
机译:Senex Energy报告了其在澳大利亚库珀盆地项目的强劲进展。随着最近在库珀盆地西部侧翼的Martlet油田开始生产,该运营商加强了其生产收入基础。该字段位于PEL 104(Senex为60%,运营商为Beach Energy 40%)。在短期测试中,测试了Martlet-1井流量,相当于从目标那慕尔油库中抽取了5149 b / d的流体和2,596 b / d的油。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号