首页> 外文期刊>Asia Oil and Gas Newsletter >…as InterMoor wraps TLP job
【24h】

…as InterMoor wraps TLP job

机译:…随着InterMoor打包TLP工作

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

InterMoor has completed the marine aspects of the float-off and tow of the Tension Leg Platform (TLP) for the Malikai project off Sabah, East Malaysia. The company was hired by the Technip and Malaysia Marine and Heavy Engineering (MMHE) joint venture and loaded the TLP onto the Dockwise heavy lift vessel White Marlin at MMHE shipyard in Pasir Gudang, Malaysia. The TLP was then transported to a float-off location in the Singapore Straits for various nearshore commissioning tasks to be performed, prior to return to the shipyard.
机译:InterMoor已经完成了东马来西亚沙巴州Malikai项目的张力腿平台(TLP)的浮起和拖曳的海上作业。该公司由Technip和马来西亚海洋与重型工程(MMHE)合资企业雇用,并将TLP装载到位于马来西亚Pasir Gudang的MMHE船厂的Dockwise重型起重船White Marlin上。然后将TLP运送到新加坡海峡的下水地点,以执行各种近岸调试任务,然后再返回造船厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号