...
首页> 外文期刊>Human-computer interaction >Project Ernestine: Validating a GOMS Analysis for Predicting and Explaining Real-World Task Performance
【24h】

Project Ernestine: Validating a GOMS Analysis for Predicting and Explaining Real-World Task Performance

机译:Project Ernestine: Validating a GOMS Analysis for Predicting and Explaining Real-World Task Performance

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Project Ernestine served a pragmatic as well as a scientific goal: to compare the worktimes of telephone company toll and assistance operators on two different workstations and to validate a GOMS analysis for predicting and explaining real-world performance. Contrary to expectations, GOMS predicted and the data confirmed that performance with the proposed workstation was slower than with the current one. Pragmatically, this increase in performance time translates into a cost of almost $2 million a year to NYNEX. Scientifically, the GOMS models predicted performance with exceptional accuracy. The empirical data provided us with three interesting results: proof that the new workstation was slower than the old one, evidence that this difference was not constant but varied with call category, and (in a trial that spanned 4 months and collected data on 72,450 phone calls) proof that performance on the new workstation stabilized after the first month. The GOMS models predicted the first two results and explained all three. In this article, we discuss the process and results of model building as well as the design and outcome of the field trial. We assess the accuracy of GOMS predictions and use the mechanisms of the models to explain the empirical results. Last, we demonstrate how the GOMS models can be used to guide the design of a new workstation and evaluate design decisions before they are implemented.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号