首页> 外文期刊>seaisi quarterly (south east asia iron and steel institute) >Improving pre-heating process in No.3 RCM furnace of CSC
【24h】

Improving pre-heating process in No.3 RCM furnace of CSC

机译:Improving pre-heating process in No.3 RCM furnace of CSC

获取原文
           

摘要

© 2017 South East Asian Iron and Steel Institute. All rights reserved.3RCM is so called reversing cold rolling mill and dedicated to producing high-grade electrical steel (ES). High ductile-to-brittle transition temperature of high silicon content ES is apt to suffer brittle fracture while being rolled at room temperature. Therefore, it's necessary for coils to be processed with pre-heating treatment beforehand. 3RCM is equipped with a pre-heating furnace for high-grade ES. However, longer pre-heating time and poor inside coil lap temperature uniformity become the bottleneck of production. With improvement remedies applied herein, it not only improves the longer pre-heating time and poor inside lap coil temperature uniformity issue, but also saves the energy of natural gas and electricity consumption.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号