Building Regulations Part S (England) has been introduced to drive the installation of adequate electric vehicle (EV) charging point infrastructure within developments. It anticipates up to 145,000 extra charging points will be installed across England each year up to 2030. Part S came into force on 15 June 2022. It does not apply in relation to building work where a building notice or full plans were deposited with a local authority before 15 June 2022, provided that the building work started before 15 June 2023.