...
首页> 外文期刊>Automotive Engineer >Cost cutting by modelling Dimensional Variability
【24h】

Cost cutting by modelling Dimensional Variability

机译:Cost cutting by modelling Dimensional Variability

获取原文
获取原文并翻译 | 示例
           

摘要

Modelling dimensional variability from the beginning of the Ford Windstar minivan project eliminated hundreds of engineering changes that would have affected nearly every component in the vehicle. Estimated cost savings are between $5 000 000 and $10 000 000. The Ford Windstar is believed to be the first vehicle on which dimensional variability modelling was performed from the beginning of the design process. Ford USA's Manager of Vehicle Engineering Attributes, Tom Sweder explains.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号