首页> 外文期刊>Hydro review >Future Unit Fish Bypass Planned for Wanapum Dam
【24h】

Future Unit Fish Bypass Planned for Wanapum Dam

机译:Future Unit Fish Bypass Planned for Wanapum Dam

获取原文
获取原文并翻译 | 示例
           

摘要

In the spring of 2007, Public Utility District No. 2 of Grant County will test a future unit fish bypass at the 1,038-MW Wanapum Dam. This system, which takes advantage of attraction flows from the turbines, is expected to further improve survival of salmon smolts passing the dam, helping the utility reach its target 95 percent dam passage survival rate.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号