...
首页> 外文期刊>Argus nefte transport >Kashagan CPC doubts
【24h】

Kashagan CPC doubts

机译:中共喀什干党的怀疑

获取原文
获取原文并翻译 | 示例

摘要

Crude from Kazakhstan’s 13bn bl offshore Kashagan field is scheduled to start flowing through the Caspian Pipeline Consortium (CPC) system next month, but the country’s energy minister has cast doubt on whether loadings will go ahead as planned. Next month’s CPC Blend schedule includes 83,500t of Kashagan crude from project partners Italy’s Eni, Shell and ExxonMobil. Based on Kashagan CPC flows, Eni subsidiary Agip Caspian Sea is expected to add 7,000t to a Karachaganak Petroleum Operating (KPO) cargo loading on 23-24 October, while Shell will add 25,000t to a larger KPO shipment on 29-30 October. ExxonMobil is due to load 51,500t as part of a 145,050t cargo on 30-31 October.
机译:哈萨克斯坦130亿桶海上Kashagan油田的原油计划于下个月开始流经里海管道财团(CPC)系统,但该国能源部长对装船量能否按计划进行表示怀疑。下个月的CPC混合时间表包括来自项目合作伙伴意大利的Eni,Shell和ExxonMobil的83,500吨Kashagan原油。根据Kashagan CPC的流量,预计Eni子公司Agip Caspian Sea将于10月23日至24日向Karachaganak石油业务(KPO)货物增加7,000吨,而Shell将于10月29日至30日向较大的KPO货物增加25,000吨。埃克森美孚计划于10月30日至31日装载51,500t货物,作为145,050t货物的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号