首页> 外文期刊>Argus nefte transport >Messoyakh pipleine ready
【24h】

Messoyakh pipleine ready

机译:弥赛亚管道准备就绪

获取原文
获取原文并翻译 | 示例
           

摘要

Gazpromneft has completed laying a 140,000 b/d pipeline linking the 495mn t (3.6bn bl) Messoyakh group of fields in Yamal-Nenets to Transneft's Zapol- yarye-Purpe (Z-P) pipeline. The company aims to start pumping crude from East Messoyakh through the 96km pipeline for eastbound supply through the East Siberia-Pacific Ocean (ESPO) pipeline at the end of this year. The line links East Messoyakh with the starting point of the Z-P line, which will carry oil from new fields in Yamal Nenets for onward shipment through the ESPO pipeline.
机译:俄罗斯天然气工业股份公司(Gazpromneft)已完成铺设一条14万桶/天的管道,该管道将亚马尔-涅涅茨(Jamal-Nenets)的4.95亿吨(36亿桶)梅索亚赫油田连接至Transneft的Zapolyarye-Purpe(Z-P)管道。该公司的目标是从今年年底开始,通过96公里长的管道从东麦索雅克(East Messoyakh)泵送原油,以通过东西伯利亚-太平洋(ESPO)管道向东输送石油。这条线将东梅索亚赫(East Messoyakh)与Z-P线的起点连接起来,Z-P线将从亚马尔涅涅茨(Yamal Nenets)的新油田运送石油,然后通过ESPO管道进行运输。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号