首页> 外文期刊>Argus nefte transport >NNK to up Vladivostok capacity
【24h】

NNK to up Vladivostok capacity

机译:NNK提高符拉迪沃斯托克(Vladivostok)的容量

获取原文
获取原文并翻译 | 示例
       

摘要

NNK is considering expanding its products terminal at Russia’s far-east port of Vladivostok to 4.5mn t/yr from 3mn t/yr, finance and economics direc- tor Sergei Lobachev told this month’s economic forum in Vladivostok. A final decision on the Rbs10bn ($150mn) project has not yet been made, but if it goes ahead it will take about five years to complete. The ter- minal handles product from NNK’s 90,000 b/d Khabarovsk refinery and other producers. NNK does not plan to suspend loadings to carry out the work, Lobachev said. The project entails upping storage capacity to 194,000m3 from 161,500m3, boosting loading rates and dredging the berth so that it can take vessels with a 10m draught, up from the current 6m.
机译:金融和经济总监谢尔盖·洛巴切夫(Sergei Lobachev)在本月在符拉迪沃斯托克(Vladivostok)举行的经济论坛上表示,NNK正在考虑将其俄罗斯远东符拉迪沃斯托克(海参div)港口的产品码头从每年300万吨扩大至450万吨/年。 100亿卢比(1.5亿美元)项目的最终决定尚未做出,但如果继续进行,则大约需要五年时间才能完成。该终端处理的产品来自NNK的90,000桶/日的哈巴罗夫斯克炼油厂和其他生产商。洛巴切夫说,NNK并不打算暂停装载工作。该项目需要将存储容量从161,500m3提升至194,000m3,提高装载率并疏通泊位,以便能够从目前的600万升到1000万升的船舶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号