【24h】

In Brief

机译:简单来说

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Nigerian oil frm NNPC has resumed partial refnery runs at its Port Harcourt, Warri and Kaduna refneries after carrying out repairs at the plants and to pipe- lines supplying them. The refneries have a combined capacity of 445,000 b/d, but operated at less than 5pc of that in the frst 11 months of last year. This led to acute domestic fuel shortfalls and a greater need for imports. Criminal damage to pipelines and delayed subsidy payments to fuel importers further tightened the market. NNPC wants the refneries to produce nearly 65,000 b/d of gasoline by the end of this month, up from just over 40,000 b/d now.
机译:尼日利亚石油公司NNPC在对工厂进行维修并向其供应管道后,恢复了其在Harcourt,Warri和Kaduna港口的部分炼油厂的运行。这些垃圾处理厂的总处理能力为44.5万桶/天,但在去年的前11个月中的处理能力不到其5%。这导致国内燃料严重短缺,对进口的需求更大。管道的刑事损害和对燃料进口商的延迟补贴付款进一步拉紧了市场。 NNPC希望这些炼油厂在本月底之前能够生产近65,000桶/天的汽油,高于目前的40,000桶/天。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号