首页> 外文期刊>Arab Steel >Turkey-Greece Pipeline Work to Start Soon
【24h】

Turkey-Greece Pipeline Work to Start Soon

机译:土耳其-希腊管道工程即将开始

获取原文
获取原文并翻译 | 示例
           

摘要

Greece - Construction of the Turkey-Greece natural gas pipeline is scheduled to start at the beginning of July, Greek Development Minister Dimitris Sioufas said Friday, The 186-mile pipeline will run from Bursa, Turkey, to Komotini in Greece and is designed to transport Caspian and Central Asian natural gas to Europe. Initially, the pipeline will transport 3.5 billion cubic meters of gas a year, but will increase to 11.5 billion cubic meters a year once the pipeline is connected to two other planned gas pipe-. lines, Sioufas said. The first of these will run for 373 miles across northern Greece from Komotini to the northwest Greek port of Stavrolimena, where it will connect with 137-mile long pipeline under the Ionian Sea to Italy. The underwater section will be built by Greece's natural gas supplier Depa and Italy's Edison SpA.
机译:希腊-希腊发展部长Dimitris Sioufas周五表示,土耳其-希腊天然气管道的建设计划于7月初开始,这条186英里长的管道将从土耳其布尔萨延伸至希腊的科莫蒂尼,旨在运输里海和中亚天然气运往欧洲。最初,该管道每年将输送35亿立方米的天然气,但一旦该管道与其他两条计划中的天然气管道连接,则每年将增加至115亿立方米。西欧法斯说。其中第一批将横跨希腊北部,从科莫蒂尼(Komotini)到希腊西北港口Stavrolimena,运行373英里,在那里它将与爱奥尼亚海下通往意大利的137英里长的管道连接。水下部分将由希腊的天然气供应商Depa和意大利的Edison SpA建造。

著录项

  • 来源
    《Arab Steel》 |2005年第351期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 冶金工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号