首页> 外文期刊>Arab Oil & Gas Magazine >KHE-9 Development Well Yielded a Stabilized Flow of 3,040 B/D of Crude
【24h】

KHE-9 Development Well Yielded a Stabilized Flow of 3,040 B/D of Crude

机译:KHE-9开发井的稳定产量为3,040桶/天

获取原文
获取原文并翻译 | 示例
           

摘要

Gulfsands Petroleum has completed the drilling of the KHE-9 well, the first of three development wells planned at the Khurbet East field. The British firm announced that the well, located around one kilometer south of the KHE-1 well, was taken down to a depth of 1,986 meters and penetrated the crest of the Cretaceous Massive reservoir at a depth of 1,937 meters. Preliminary results indicate that the well encountered 26 meters of gross oil pay and 23 meters of net pay.
机译:Gulfsands石油公司已经完成了KHE-9井的钻探工作,这是计划在Khurbet East油田开发的三口井中的第一口。这家英国公司宣布,该井位于KHE-1井以南约1公里处,被钻至1,986米的深度,并穿透了1,937米深度的白垩纪大水库顶部。初步结果表明,该井的总产油量为26米,净收入为23米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号