首页> 外文期刊>Arab Oil & Gas >Total Expects SRAK to Start Drilling Operations on its Acreage in Late 2005 or Early 2006
【24h】

Total Expects SRAK to Start Drilling Operations on its Acreage in Late 2005 or Early 2006

机译:道达尔预计SRAK将于2005年末或2006年初在其种植面积上开始钻探作业

获取原文
获取原文并翻译 | 示例
           

摘要

At a press conference in Paris on 8 September,the Executive Vice-President Exploration-Production of Total,Mr.Christophe de Margerie,suggested that drilling operations on the South Rub'Al Khali acreage would start in late 2005 or early 2006.The 209,160-sq km acreage is held by South Rub'Al Khali Company Limited (SRAK),a joint venture between Royal Dutch/Shell (40%),Total (30%) and Saudi Aramco (30%).Mr.de Margerie explained that the exploration program was running two or three months behind schedule because of the terrorist attacks at Al Khobar in the spring (AOG,16 May,2004),but that work was now going ahead normally.
机译:在9月8日于巴黎举行的新闻发布会上,道达尔公司执行副总裁克里斯托夫·德玛格丽(Christophe de Margerie)先生建议在南鲁巴·哈利(South Rub'Al Khali)土地上进行钻探作业,该作业将于2005年底或2006年初开始。209,160皇家荷兰/壳牌(40%),道达尔(30%)和沙特阿美(30%)的合资企业South Rub'Al Khali Company Limited(SRAK)拥有10平方公里的土地.de Margerie先生解释说由于春季在Al Khobar发生恐怖袭击(AOG,2004年5月16日),该勘探计划比原定计划推迟了两三个月,但该工作现在正常进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号