首页> 外文期刊>Arab Oil & Gas Magazine >Oil Is Being Pumped Once Again Through the Pipeline Linking the Omar Field to the al-Tayyem Station
【24h】

Oil Is Being Pumped Once Again Through the Pipeline Linking the Omar Field to the al-Tayyem Station

机译:石油再次通过连接奥马尔油田与al-Tayyem站的管道进行抽水

获取原文
获取原文并翻译 | 示例
           

摘要

Talking to the official Syrian News Agency (Sana) on 15 July, the Chairman of the Board of Al-Furat Petroleum Company (AFPC), Mr. Said Hneidi, indicated that it had resumed pumping oil through the pipeline running from the Omar field to the al-Tayyem pumping station, in the Deir ez-Zor region, following the completion of repair work to the pipeline. Mr. Hneidi explained that a 30-meter section of the 24-inch pipeline had been replaced and that the fire which had broken out during the night of 12-13 July had been brought under control within three hours.
机译:7月15日,Al-Furat石油公司(AFPC)董事会主席赛义德·赫尼迪先生在与叙利亚官方通讯社(Sana)进行会谈时表示,该公司已恢复通过从奥马尔油田通往奥马多油田的输油管道。完成对管道的维修工作后,位于代尔ez-Zor地区的al-Tayyem泵站。 Hneidi先生解释说,已替换了24英寸管道中30米长的部分,在7月12日至13日夜间发生的大火在三个小时内得到了控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号