首页> 外文期刊>Arab Oil & Gas Magazine >Funding Package for the Satorp Refinery Could Be Finalized by the End of January
【24h】

Funding Package for the Satorp Refinery Could Be Finalized by the End of January

机译:Satorp炼油厂的融资方案可能在1月底完成

获取原文
获取原文并翻译 | 示例
           

摘要

Saudi Aramco Total Refining and Petrochemical Company (Satorp), a joint venture between Saudi Aramco (62.5%) and the French company Total (37.5%), is seeking to finalize a funding package for its "huge" project by the end of January, the Vice-President Strategic Planning of Total, Mr. Jean-Jacques Mosconi, told a conference in London. Al Watan reported in August that the company was seeking to raise borrowings of SR 30 billion ($8 billion), with SR 16.9 billion to be provided by international banks and export credit agencies, SR 5.6 billion by Saudi banks and SR 7.5 billion by state funding agencies in Saudi Arabia.
机译:沙特阿美(62.5%)与法国道达尔(37.5%)的合资企业沙特阿美石油公司(Satorp)正寻求在1月底前完成其“庞大”项目的融资方案,道达尔集团副总裁战略计划让·雅克·莫斯科尼先生在伦敦的一次会议上说。 Al Watan在8月的报告中表示,该公司正寻求筹集300亿里亚尔(80亿美元)的债务,其中169亿里亚尔由国际银行和出口信贷机构提供,56亿里亚尔由沙特银行提供,75亿里亚尔由国家资金提供沙特阿拉伯的代理商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号