首页> 外文期刊>Arab Oil & Gas Magazine >Gulf Keystone Petroleum Is Due to Spud its First Well on the Shaikan Tract Early in the Second Quarter
【24h】

Gulf Keystone Petroleum Is Due to Spud its First Well on the Shaikan Tract Early in the Second Quarter

机译:海湾基斯通石油公司将在第二季度初在Shaikan油田开钻第一口井

获取原文
获取原文并翻译 | 示例
           

摘要

Exploration operations are continuing on the Shaikan tract, which is located near the town of Dihok, in Iraqi Kurdistan. Operator Gulf Keystone Petroleum Limited says it has leased the Nov Ideal drilling rig from Weatherford Drilling International and that it should arrive in Iraq before the end of February. The first exploration well, Shaikan-1, will probably be spudded at the beginning of the second quarter. All the preparations for its drilling are well advanced.
机译:位于伊拉克库尔德斯坦Dihok镇附近的Shaikan地区正在继续进行勘探作业。运营商海湾基斯通石油有限公司(Gulf Keystone Petroleum Limited)说,它已从韦瑟福德国际钻井公司租赁了Nov Ideal钻机,该钻机应在2月底前到达伊拉克。第一口勘探井Shaikan-1可能会在第二季度初开钻。钻探的所有准备工作都非常先进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号