...
首页> 外文期刊>Arab Oil & Gas Magazine >TBK Has Completed the Construction of a Pipeline Linking the Abu al-Bukhoosh Field to Das Island
【24h】

TBK Has Completed the Construction of a Pipeline Linking the Abu al-Bukhoosh Field to Das Island

机译:TBK已完成连接阿布·布·胡克什(Abu al-Bukhoosh)油田和达斯岛(Das Island)的管道建设

获取原文
获取原文并翻译 | 示例
           

摘要

Total Abu Al Bukhoosh (TBK),an affiliate of the French company Total,has completed the construction of a 52-km subsea pipeline linking the offshore Abu al-Bukhoosh oilfield in Abu Dhabi to the Das Island terminal.The 10-inch diameter pipeline will enable the company to export its crude directly via the terminal instead of utilizing floating storage and offloading facilities,explained Abu Dhabi Marine Operating Company (Adma-Opco).
机译:法国道达尔公司(Total)的子公司道达尔(Abu Al Bukhoosh)(TBK)已完成一条52公里长的海底管道的建设,该管道将阿布扎比近海的阿布·阿布·胡克什(Abu al-Bukhoosh)油田连接到达斯岛码头。这条直径10英寸的管道Abu Dhabi Marine Operating Company(Adma-Opco)解释说,这将使该公司能够直接通过码头出口其原油,而无需利用浮动存储和卸货设施。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号