首页> 外文期刊>Arab Oil & Gas Magazine >Tender to Be Issued Shortly for the Construction of the al-Shaheen Refinery
【24h】

Tender to Be Issued Shortly for the Construction of the al-Shaheen Refinery

机译:沙欣炼油厂建设不久将招标

获取原文
获取原文并翻译 | 示例
           

摘要

The Qatari Energy Minister,Mr.Abdallah bin Hamad al-Attiyah,has announced that a tender will be issued shortly for the construction of the al-Shaheen refinery,which will be the country's third.Mr.al-Attiyah added that technical and economic feasibility studies of the project,which calls for the development of a plant with a capacity of 250,000 b/d,had been completed and that the refinery was scheduled to come on stream in 2011.
机译:卡塔尔能源部长阿卜杜拉·本·哈马德·阿蒂雅先生宣布,不久将为建设沙赫恩炼油厂招标,这将是该国的第三座炼油厂。阿勒迪亚先生补充说,技术和经济该项目的可行性研究要求开发一座日产能为25万桶的装置,现已完成,精炼厂计划于2011年投入生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号