首页> 外文期刊>Arab Oil & Gas Magazine >Improving Cycle Time for Production in Deepwater
【24h】

Improving Cycle Time for Production in Deepwater

机译:缩短深水生产的周期时间

获取原文
获取原文并翻译 | 示例
           

摘要

The theme for DOT 2005,"Improving Cycle Time for Production in Deepwater,"will focus on the growing emphasis on fast track projects and early production.DOT International Conference & Exhibition once again turns its attention to the world's vital deepwater markets as it travels to the pristine city of Vitoria,Brazil.Located just northeast of Rio de Janeiro,Vitoria is positioned as the center of activity supporting deepwater exploration and production operations offshore Espirito Santo,Brazil.Over 1,800 attendees and 100 exhibitions are expected from the energy centers of the world.
机译:DOT 2005的主题是“改善深水生产的周期时间”,其重点是对快速通道项目和早期生产的日益重视。DOT国际会议与展览会再次将注意力转向了世界重要的深水市场。维多利亚位于巴西的原始城市维多利亚市,位于里约热内卢东北部,是支持巴西埃斯皮里图州圣埃斯皮里图(Espirito Santo)近海深水勘探和生产运营的活动中心。预计该地区的能源中心将有1800多名与会者和100个展览会世界。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号