首页> 外文期刊>Arab Oil & Gas >Gulfsands Contracts Crosco to Drill its First Well on Block 26 Starting in Late April or Early May
【24h】

Gulfsands Contracts Crosco to Drill its First Well on Block 26 Starting in Late April or Early May

机译:Gulfsands与Crosco签订合同,从4月底或5月初开始,Crosco在26区块钻探第一口井

获取原文
获取原文并翻译 | 示例
           

摘要

Gulfsands Petroleum Pic has announced the signing of two contracts,one with Crosco Integrated Drilling & Well Services Co.Ltd.and the other with MB Drilling Overseas Limited,for the drilling of three wells on Block 26,with an option for two more.Gulfsands will utilize a Crosco rig for the drilling and appraisal of its first well on the tract,Suweidiyeh North,which is due to be spudded at the end of April or the beginning of May,and has an option for the drilling of a second well under its contract with the Croatian company.
机译:Gulfsands Petroleum Pic已宣布与Crosco Integrated Drilling&Well Services Co.Ltd。签订另一份合同,与MB Drilling Overseas Limited签订另一份合同,用于在26区块钻探三口井,并可选择另外两口。将使用Crosco钻机在该地区Suweidiyeh North的第一口井进行钻探和评估,该井将于4月底或5月初开钻,并且可以选择在第二口井下钻探第二口井。与克罗地亚公司的合同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号