...
首页> 外文期刊>Arab Oil & Gas >JGC Wins the FEED Contract for the Shell GTL Plant and the EPC Contract for the Expansion of Qapco's Ethylene Plant
【24h】

JGC Wins the FEED Contract for the Shell GTL Plant and the EPC Contract for the Expansion of Qapco's Ethylene Plant

机译:JGC赢得壳牌GTL工厂的FEED合同和Qapco乙烯工厂扩建的EPC合同

获取原文
获取原文并翻译 | 示例
           

摘要

Within the space of a few days,the Japanese company JGC Inc.won two major contracts in Qatar for the following projects:After announcing the award of the FEED (front-end engineering and design) contract for its planned 140,000-b/d gas-to-liquids (GTL) plant to JGC on 9 March,Shell Global Solutions International,part of the Royal Dutch/Shell group,has now finalized it.In the execution of the work,which is scheduled for completion by May 2005,JGC will call on the services of M.W.Kellogg Ltd.,its London-based joint venture with KBR,part of the U.S.Halliburton group (AOG,16 March,2004).The GTL plant is to be built in two phases,each with a capacity of 70,000 b/d.The total cost of the upstream and downstream work is estimated at US5 billion (for the details,see AOG,1 Nov.,2003,and 1 March,2004).
机译:在短短几天内,日本公司JGC Inc.在卡塔尔赢得了两个主要项目,涉及以下项目:在宣布授予其计划的14万桶/天天然气的FEED(前端工程和设计)合同后皇家荷兰/壳牌集团的一部分,壳牌全球解决方案国际(壳牌全球解决方案国际)已于3月9日移交给JGC,目前已经完成。在计划于2005年5月完成的工作中,JGC GTL工厂将分两期建设,每个阶段将具备能力,该工厂将与MWKellogg Ltd.一起提供服务,MWKellogg Ltd.是伦敦与KBR的合资企业,隶属于USHalliburton集团(AOG,2004年3月16日)。 70,000桶/天。上游和下游工作的总成本估计为50亿美元(详细信息,请参见AOG,2003年11月1日和2004年3月1日)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号