...
首页> 外文期刊>Arab Oil & Gas >First Development Well at Khurbet East to Be Brought into Production in the Fourth Quarter
【24h】

First Development Well at Khurbet East to Be Brought into Production in the Fourth Quarter

机译:东库尔贝特的第一口开发井将于第四季度投入生产

获取原文
获取原文并翻译 | 示例
           

摘要

Gulfsands, Petroleum has announced the successful completion of its first development well at the Khurbet East field, after receiving the Syrian authorities' approval for its development plan (AOG, 16 Feb., 2008). The KHE-4 well was taken down to a depth of 1,935 meters and suspended as a future producer.
机译:在获得叙利亚当局批准其开发计划的批准后,墨西哥湾湾石油公司(Gulfsands Petroleum)宣布已成功完成在库尔贝特(Khurbet East)油田的第一口开发井(AOG,2008年2月16日)。将KHE-4井下移至1,935米的深度,并作为将来的生产井而暂停使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号