...
首页> 外文期刊>Arab Oil & Gas >Noble Energy Suspends the Leviathan 1 Well and Confirms the Completion of the Tamar Development for the End of 2012
【24h】

Noble Energy Suspends the Leviathan 1 Well and Confirms the Completion of the Tamar Development for the End of 2012

机译:来宝能源暂停Leviathan 1井并确认添马舰开发工作将于2012年底完成

获取原文
获取原文并翻译 | 示例

摘要

Noble Energy has suspended the Leviathan 1 well, which was being drilled to test the potential of a deep prospect on the offshore Rachel license. The U.S. company indicated on 1 April that it had found some wear in the well's casing and that additional materials and equipment were required to complete the well that were not available in Israel. As a result, Noble Energy was preparing to transfer the Sedco Express drilling rig to the neighboring Tamar field, which is located on the Matan license and where development drilling was due to begin one week later. The company confirmed that the development of the Tamar field would be completed at the end of 2012, as planned.
机译:来宝能源(Noble Energy)已暂停Leviathan 1井的钻探,以测试Rachel海上许可证的深层勘探潜力。这家美国公司于4月1日表示,它已发现该井套管的磨损,并且需要额外的材料和设备来完井,而这在以色列是无法获得的。因此,来宝能源准备将Sedco Express钻机转移到邻近的Tamar油田,该油田位于Matan许可证上,开发钻探将在一周后开始。该公司确认,添马舰油田的开发将按计划于2012年底完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号