...
首页> 外文期刊>Arab Oil & Gas >DEWA Has Decided to Double the Capacity of its Planned Coal-Fired Power Station to 3,000 MW
【24h】

DEWA Has Decided to Double the Capacity of its Planned Coal-Fired Power Station to 3,000 MW

机译:DEWA已决定将其计划中的燃煤电站的容量增加一倍,达到3,000 MW

获取原文
获取原文并翻译 | 示例
           

摘要

Dubai Electricity and Water Authority (DEWA) has decided to double the capacity of the clean coal power station it is planning to develop to 3,000 MW, according to its Chief Executive Officer, Mr. Saeed Mohammed al-Tayer. Announcing this decision, Mr. al-Tayer assured a press conference that there would be no power shortage in the emirate over the next five years. By the end of 2011 Dubai will have total power generation capacity of 10,000 MW. According to DEWA's website, Dubai's peak power consumption reached 6,161 MW last summer, up from 5,622 MW in 2009.
机译:迪拜电力和水务局(DEWA)首席执行官Saeed Mohammed al-Tayer先生表示,已决定将其计划发展的清洁煤电厂的产能提高一倍,达到3,000 MW。阿尔·泰耶宣布这一决定时,向新闻发布会保证,在未来五年内,该酋长国将不会出现电力短缺。到2011年底,迪拜的总发电量将达到10,000兆瓦。根据DEWA的网站,去年夏天迪拜的峰值用电量从2009年的5,622兆瓦达到了6,161兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号