首页> 外文期刊>Argus Coal Transportation >UP seeks to block claims from PRB force majeure
【24h】

UP seeks to block claims from PRB force majeure

机译:UP试图阻止PRB不可抗力的索赔

获取原文
获取原文并翻译 | 示例
       

摘要

Union Pacific hopes to stop utility Entergy from seeking damage claims for Southern Powder River Basin coal that it did not deliver last year while operating under force majeure conditions. Two separate derailments May 14-15 blocked all three lines serving the Southern PRB. Significant amounts of snow and rain had waterlogged the railbed, where poor drainage caused by coal dust in the ballast is believed to have contributed to the derailments. Both BNSF and UP notified customers of a force majeure event delay shortly after the derailments. Because of the derailments and subsequent repair efforts, significant amounts of coal were not delivered in the second half of 2005.
机译:Union Pacific希望阻止Entergy寻求对南部粉末河盆地煤炭的损害索赔,而该公司去年在不可抗力条件下没有交付。 5月14日至15日发生了两次单独的出轨,堵塞了服务于南部PRB的所有三条线路。大量的雪和雨使铁路道水淹,据认为,由于压载物中煤尘引起的排水不良,造成了铁路道岔。 BNSF和UP均在出轨后不久就通知不可抗力事件延迟的客户。由于出轨和随后的维修工作,2005年下半年未交付大量煤炭。

著录项

  • 来源
    《Argus Coal Transportation》 |2006年第7期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 化学工业;
  • 关键词

  • 入库时间 2022-08-18 10:15:34

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号