...
首页> 外文期刊>Argus Coal Daily >PPL to install Brunner cooling towers
【24h】

PPL to install Brunner cooling towers

机译:PPL安装Brunner冷却塔

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

PPL will spend 125 million dollars to install cooling towers to control high-temperature discharges into the Susquehanna River at its 1,485MW Brunner Island generating station in York County, Pa., under a deal reached with state regulators. Brunner Island draws 795 million gallons/day of water from the Susquehanna, returning it warmer than the surrounding river flow. State regulators had provided a variance for the plant, saying the warmer water discharged still provided for balanced, indigenous aquatic ecosystem, but studies from 2002-2005 conducted by PPL showed an adverse impact on the river.
机译:根据与州监管机构达成的协议,PPL将斥资1.25亿美元在其宾夕法尼亚州约克县的1,485MW Brunner Island发电站安装冷却塔,以控制向萨斯奎哈纳河的高温排放。布鲁纳岛每天从萨斯奎哈那(Susquehanna)汲取7.95亿加仑水,使之比周围的河水温暖。州监管机构对这种植物进行了规定,称排放的温水仍为当地的平衡水生生态系统提供了便利,但PPL在2002-2005年进行的研究表明,这对河流造成了不利影响。

著录项

  • 来源
    《Argus Coal Daily》 |2006年第58期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号