A conversion to wood pellet at Danish utility Dong Energy's coal-fired unit 3 at its 715MW Studstrup combined heat and power(CHP)plant in Aarhus will start in the summer and be completed by August 2016.“A heat agreement for the Studstrup plant has been settled,a final investment decision has been taken and construction work has already started,” Dong said.The conversion will consume 600,000-800,000 t/ yr of wood pellets. A bill passed by the Danish Parliament in June has re-solved a legislative issue that had postponed the conversion of the Studstrup power plant,Dong said.Before the new bill was passed,taxes were settled on a monthly basis which meant that heat and power production based on biomass was subject to taxes intended for fossil fuels,Dong said. “With the new legislation in place,central power stations can settle taxes on an hourly basis instead of a monthly basis and thus pay proper taxes on fuels for electricity and heat production.
机译:丹麦公用事业公司Dong Energy的奥胡斯715MW Studstrup热电联产电厂的燃煤3号机组将转换为木屑颗粒,将于夏天开始,并于2016年8月完成。 “已经解决,最终投资决定已经决定,建设工作已经开始。” Dong说。该转换每年将消耗600,000-800,000吨木屑颗粒。董建华说,丹麦议会在6月份通过的一项法案已经解决了推迟Studstrup电厂改建的立法问题。在新法案获得通过之前,税款是按月结算的,这意味着热电联产董说,基于生物质的生产必须缴纳用于化石燃料的税收。 “有了新的法规,中央电站可以按小时而不是按月结算税,从而为发电和供热的燃料缴纳适当的税。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号