首页> 外文期刊>Argus Americas Asphalt >German refinery runs rise in August
【24h】

German refinery runs rise in August

机译:德国八月炼油厂运行上升

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

German refineries produced 7.2pc more finished products in August than in the same month a year earlier, as the utilisation rate hit a year-to-date high of 95.8pc. Gasoline production was up on the year, mainly because output in August 2015 was limited at one of Germany’s key producers - the 301,000 b/d Miro refinery in Karlsruhe - after a fire damaged an FCC unit in early July that year. Gasoline output was also up on the previous month, as crack spreads for the product averaged around $8.8/bl in August, compared with $7.7/bl in July.
机译:由于利用率达到了今年以来的最高水平95.8%,德国8月炼油厂的成品产量比去年同期增加了7.2%。汽油产量同比有所增长,主要是由于2015年8月德国主要生产商之一-卡尔斯鲁厄的Miro炼油厂的日产量为301,000桶/天,产量受到限制,当时该厂7月初大火烧毁了FCC装置。汽油产量也比上月有所增加,因为该产品的裂解价差在8月份平均约为8.8美元/桶,而7月份为7.7美元/桶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号