...
首页> 外文期刊>Containerisation International >Multimodal facility under way in Santos
【24h】

Multimodal facility under way in Santos

机译:多通道设施在桑托斯

获取原文
获取原文并翻译 | 示例
           

摘要

The Brazilian rail operator MRS Logistica is partnering with the terminal operator Libra Termi-nais to build a new, BRL100 (USD59.8) million intermodal facility for the severely congested port of Santos. Libra Terminals operates the T-35 and T-37 container terminals at Santos, in southern Brazil. Construction work began, at the end of May, on the road/rail Terminal Maritimo do Valongo (Teval). It is scheduled to open by December 2008 and will be located near the Tecondi container terminal.
机译:巴西铁路运营商Logistica夫人与天秤码头运营商合作Termi-nais建造一个新的BRL100(59.8美元)百万联运设施严重拥挤的桑托斯港。T-35和T-37集装箱码头运营桑托斯在巴西南部。开始时,在5月底,在公路/铁路终端Maritimo做Valongo (Teval)。计划到2008年12月,将开放位于Tecondi集装箱码头附近。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号