...
首页> 外文期刊>Argus Biomass Markets >Finland’s TS E to start building CHP plant in May
【24h】

Finland’s TS E to start building CHP plant in May

机译:芬兰的TS E将于五月开始建造CHP工厂

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Finland’s Turku Regional Energy (TSE), a subsidiary of Finnish utility Fortum, is poised to break ground on its planned 150MW combined heat and power (CHP) plant in Naantali, Finland in May. The ?260mn ($298mn) plant will provide 150MW of power and 250MW of district heat, and will be operational in the fourth quarter of 2017. The CHP plant will be a multi-fuel facility capable of cofiring biomass with coal. “The boiler will offer us flexibility to burn up to 70pc biomass, primarily wood chips,” managing director Tapani Bastman said.
机译:芬兰公用事业公司Fortum的子公司芬兰图尔库地区能源(TSE)计划于5月在芬兰Naantali计划建设的150MW热电联产工厂破土动工。这个耗资2.6亿欧元(2.98亿美元)的电厂将提供150兆瓦的电力和250兆瓦的区域供热,并将于2017年第四季度投入运营。该热电联产电厂将是一种多燃料设施,能够将生物质与煤共烧。 “该锅炉将为我们提供燃烧多达70%生物质(主要是木屑)的灵活性,”董事总经理Tapani Bastman说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号