...
首页> 外文期刊>Argus Biomass Markets >Finland’s Seinajoen Energia plans biomass plant
【24h】

Finland’s Seinajoen Energia plans biomass plant

机译:芬兰的Seinajoen Energia计划建设生物质工厂

获取原文
获取原文并翻译 | 示例

摘要

Finnish utility Seinajoen Energia plans to build a 120MW biomass-fuelled heat plant in Seinajoki, western Finland. A new 90MW biomass boiler will be supplied while the existing heavy fuel oil boiler will be modifed to a wood pellet boiler with 30MW heat generation capacity, bringing the total heat capacity of the installation to 120MW. The heating plant will be run as backup for a peak load district heating plant and commercial operations are expected to begin in December 2016.
机译:芬兰公用事业公司Seinajoen Energia计划在芬兰西部的Seinajoki建立一个120兆瓦的生物质燃料供热厂。将提供一个新的90兆瓦生物质锅炉,而现有的重质燃油锅炉将改造为具有30兆瓦生热能力的木屑颗粒锅炉,使装置的总热容达到120兆瓦。该供热厂将作为高峰负荷区域供热厂的备用设备运行,预计将于2016年12月开始商业运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号