...
【24h】

Enbridge plans rail terminal while waiting for pipeline approval.

机译:安桥公司计划铁路终端在等待管道的批准。

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Canada's largest pipeline company is considering the construction of a unit train unloading terminal and a pipeline receipt point in Illinois, US, according to a filing with the Federal Energy Regulatory Commission. The unloading terminal will if built have a capacity of 140K b/d-enough to handle two unit trains daily-and be located at the origin of Enbridge's new 600K-b/d Flanagan South Pipeline in Pontiac, Illinois. The company is also seeking permission for a receipt point on its Lakehead pipeline system in nearby Flanagan, Illinois, to load crude into Flanagan South.
机译:加拿大最大的管道公司正在考虑建设单位培训卸货终端和管道在收据据提交给美国伊利诺斯州联邦能源监管委员会。卸载终端将如果建造能力140 k b / d-enough处理两个单元列车地是位于安桥的起源新的600 k-b / d弗拉纳根南管道在庞蒂亚克伊利诺斯州。收据点湖畔管道系统在附近的弗拉纳根,伊利诺斯州,负载原油弗拉纳根南。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号