首页> 外文期刊>Industrial & Engineering Chemistry Research >Production Scheduling of a Large-Scale Steelmaking Continuous Casting Process via Unit-Specific Event-Based Continuous-Time Models: Short-Term and Medium-Term Scheduling
【24h】

Production Scheduling of a Large-Scale Steelmaking Continuous Casting Process via Unit-Specific Event-Based Continuous-Time Models: Short-Term and Medium-Term Scheduling

机译:大型炼钢生产调度通过单元特定连铸过程基于事件的连续时间模型:短期的和中期调度

获取原文
获取原文并翻译 | 示例
           

摘要

The scheduling of steelmaking continuous-casting (SCC) processes is of major importance in iron and steel operations, since it is often a bottleneck in iron and steel production. Optimal scheduling of SCC processes can increase profit, minimize production cost, reduce material and energy consumption, and improve customer satisfaction. Scheduling of SCC processes is challenging, because of its combinatorial nature, complex practical constraints, and strict requirements on material continuity and flow time, as well as the technological requirements to ensure practical feasibility of the resulting scheduling. In this paper, we first develop a novel unit-specific event-based continuous-time mixed-integer linear optimization (MILP) model for this problem and incorporate several realistic operational features. Then, we extend the rolling horizon approach proposed by lin et al. [Lin et al. Ind. Eng. Chem. Res. 2002, 41, 3884-3906] and Janak et al. [Janak et al. Ind. Eng. Chem. Res. 2006,45, 8234-8252] to solve this large-scale and complex optimization problem. Four large-scale industrial problems are used to illustrate the efficiency and effectiveness of the proposed formulation and rolling horizon approach. The computational results show that the extended rolling horizon approach successfully solves the large-scale case studies and results in the same or better integer solution than that obtained from directly solving the entire scheduling model.
机译:炼钢连铸调度(SCC)的重大过程铁和钢铁业务,因为它通常是一个在钢铁生产瓶颈。调度SCC过程可以增加利润,降低生产成本,减少材料和能源消耗,提高客户的满意度。有挑战性,因为它的组合性质,复杂的实际约束,严格要求材料连续性和流时间,以及技术要求为了确保结果的实际可行性调度。小说单元特定事件的连续时间混合整数线性规划(MILP)模型对于这个问题,把几个现实的操作特性。滚动地平线林等人提出的方法艾尔。林等。3884 - 3906年)和Janak et al。(Janak et al。Eng。大规模和复杂的优化问题。四个用于大规模工业问题说明的效率和有效性该配方和连绵起伏的地平线的方法。延长滚动地平线成功的方法解决了大规模的案例研究和结果在相同或更好的整数解从直接获得解决整个调度模型。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号