首页> 外文期刊>U.S. Coal Review >EKPC finalizes some back-half ‘18 deliveries
【24h】

EKPC finalizes some back-half ‘18 deliveries

机译:EKPC总结一些下半年的18交付

获取原文
获取原文并翻译 | 示例

摘要

East Kentucky Power Cooperative has finalizedcoal deliveries for the balance of 2018, accordingto documents filed with the Kentucky PublicService Commission:Jamieson Construction, London, Ky., is supplyingby truck 30,000 tons to the Cooper Power Station,Burnside, Ky., from Aug. 1 through Oct. 31. The coalis sourced from the Right Fork Surface Mine in BellCounty, Ky. Required “as received” coal specs are toinclude not less than 12,200 Btu/lb., no more than 8%moisture and 12% ash, with as-received sulfur contentcomputed as not more than 1.98%. Price is set FOBCooper station at 306.11 cents/MMBtu.
机译:肯塔基东部电力合作社已finalizedcoal2018年交付的平衡,根据文档向肯塔基州PublicService委员会:Jamieson建筑,伦敦,肯塔基州。supplyingby卡车30000吨的库珀次方站,伯恩赛德,肯塔基州。31. 表面我BellCounty,肯塔基州。收到“煤炭规格包括不少于12200 Btu /磅。灰,收到基硫contentcomputed不超过1.98%。站在306.11美分/ MMBtu。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号