首页> 外文期刊>Health and safety bulletin: HSB >Sherwood Homes falls foul of CDM - again
【24h】

Sherwood Homes falls foul of CDM - again

机译:舍伍德房屋瀑布犯规再次CDM -

获取原文
获取原文并翻译 | 示例
           

摘要

A construction company has been fined £170,000, with £10,406 costs, for failing to ensure the safe removal of asbestos during demolition work. Sherwood Homes was the client responsible for the demolition of Crowton Mill in Northwich, Cheshire. After an asbestos survey conducted in January 2017 identified the presence of asbestos containing materials (ACMs), Sherwood Homes failed to use suitable contractors to remove the ACMs and demolish the mill a month later. The extra work to remove the ACMs properly would have increased the estimated costs and timescale. Sherwood Homes did not notify the HSE of its intention to remove asbestos at the site. Nor was it able to provide the HSE with details of how the ACMs were removed or disposed of. David Norton, an HSE inspector, emphasised that "asbestos should only be removed by specialist contractors" and that the failure to do so "put workers at risk". Sherwood Homes was sentenced at Greater Manchester Magistrates' Court on 30 May after it was convicted of not making suitable arrangements for managing a project, including allocating sufficient time and resource (reg. 4(1) of the Construction (Design and Management) Regulations 2015 (CDM)). Peter Kiely, who was a director of the company at the time, was fined £6,500, with costs of £7,000, after he pleaded guilty to a breach of s.37 of the HSW Act in that the company's offence was committed with his consent or connivance or was otherwise attributable to his neglect. The company's most recent accounts show a pre-tax loss in 2018 of £7,263,677 on turnover of £14,701,728.
机译:建筑公司被罚款£170000,£10406成本,未能确保在拆迁工作安全清除石棉。舍伍德房屋是客户负责拆除Crowton轧机在今年,柴郡。2017年1月确定石棉的存在包含材料(ACMs系统),舍伍德的家园使用合适的承包商来删除失败一个月后ACMs系统和拆除机。额外的工作将ACMs正确会增加了估算成本和时间表。舍伍德房屋没有通知HSE的打算清除石棉。它能够提供HSE的细节ACMs被移除或处置。诺顿,HSE检查员,强调“石棉只应该被专家承包商”,未能这样做”工人在风险”。大曼彻斯特郡治安法庭5月30日后被判犯有不合适安排管理一个项目,包括分配足够的时间和资源(reg。4(1)的建设(设计与管理)规定2015 (CDM))。公司的主管,被罚款£6500£7000的成本,他恳求道犯有违反s.37 HSW法案公司犯罪与他的承诺同意或默许或否则由于他的疏忽。最近的账户显示2018年税前亏损£7263677£14701728的营业额。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号