...
首页> 外文期刊>Energy in East Europe >Vattenfall stalls new capacity plans
【24h】

Vattenfall stalls new capacity plans

机译:Vattenfall摊位新产能的计划

获取原文
获取原文并翻译 | 示例
           

摘要

Vattenfall has put plans to build up to 3,000 MW of new generation capacity in Poland on the back burner due to falling power demand and prices, the new director of the company's Polish operations, Jacek Piekacz, said January 21. "Originally, these projects were scheduled to be completed in 2015 and 2016. Certainly it will be delayed due to the conditions for carrying out these type of investments in Poland," Piekacz said in an interview with the state news agency PAR "Energy consumption and prices have fallen.
机译:Vattenfall已将计划建造3000兆瓦新一代的能力在波兰的背燃烧器由于电力需求下降和价格,公司的新董事的波兰Jacek Piekacz操作表示,1月21日。“最初,这些项目将在2015年和2016年完成。推迟实施的条件这些类型的投资在波兰,”Piekacz国家新闻机构在接受采访时说PAR“能源消费和价格下跌。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号