...
首页> 外文期刊>Energy in East Europe >Top rap for Enel ME3
【24h】

Top rap for Enel ME3

机译:顶部为埃奈尔ME3说唱

获取原文
获取原文并翻译 | 示例
           

摘要

US-based GE Energy Services announced February 9 that it had been awarded a contract to convert two electrostatic precipitators (ESPs) at the Enel Maritza East 3 TPP - the four-unit lignite-fired power plant which the Italian company has thoroughly rehabilitated since entering a JV in 2003. A key helper since the start of the modernisation process, GE is now set to complete phase 6 of an 8-phase project by converting Fields 1 and 2 of the Unit 2 precipitator from traditional "tumbling hammer" system to GE's advanced "top rap" technology, thus raising reliability and cutting maintenance costs and emissions.
机译:美国通用电气能源服务于2月9日宣布它将被授予合同两个静电除尘器(esp)埃奈尔玛丽塔东3 TPP - four-unit意大利lignite-fired电厂公司已经彻底恢复2003年进入一个合资企业。现代化过程的开始,通用电气目前集完成8-phase项目的6级将字段1和2单元2除尘器从传统“暴跌锤”系统通用的高级“说唱”技术,因此提高可靠性和减少维护成本和排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号