...
首页> 外文期刊>Energy in East Europe >Rila seeks contractor for hydro
【24h】

Rila seeks contractor for hydro

机译:Rila寻求水电的承包商

获取原文
获取原文并翻译 | 示例
           

摘要

Rila Holy Cloister plans to issue a call for contractors to design, supply, construct and commission a small hydropower plant on the Iliina River, as well as launch the plant and provide consultancy services for the environmental impact assessment of the project. The cloister intends to use the proceeds of the grant funds provided by the Kozloduy International Decommissioning Support Fund, administered by the European Bank for Reconstruction and Development, according to a notice posted on the EBRD website.
机译:Rila神圣修道院计划发出呼吁承包商的设计、供应、构造和Iliina委员会一个小型水电站河,以及启动植物和提供环境影响咨询服务项目的评估。使用提供的赠款基金收益Kozloduy国际退役支持基金,由欧洲银行重建和发展,根据欧洲复兴开发银行网站上张贴公告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号