BIM gets the pipes laid

机译:BIM的管道铺设

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Almost 400m of very large diameter, fabricated steel and ductile iron pipework has all been completed using Building Information Modelling (BIM) on the £200M project to upgrade United Utilities' (UU) Liverpool Wastewater Treatment Works. The work was carried out by UU AMP5 Process Alliance partner GCA, the Galli-ford Try, Costain and Atkins joint venture. BIM had to be used because any onsite cutting was forbidden due to the coating on the fabricated steel pipework. Therefore the installation contractors were anxious that such a large diameter network, often running to hundreds of metres with fixed points, could be laid without major on site modifications.
机译:近400的非常大的直径,编造的钢和球墨铸铁管道工程都是完成使用建筑信息建模(BIM)£200项目升级公用事业”(UU)利物浦废水处理的工作原理。甘氨胆酸流程联盟伙伴,Galli-ford尝试,Costain和阿特金斯合资企业。因为任何使用现场切割是禁止的装配式钢管道工程上的涂层。因此安装承包商经常焦虑,这样一个大直径网络与不动点运行到数百米,可能是没有主要的现场了吗修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号