...
首页> 外文期刊>Africa Intelligence >TotalEnergies boss Patrick Pouyanne stands alone in bid to develop Tilenga
【24h】

TotalEnergies boss Patrick Pouyanne stands alone in bid to develop Tilenga

机译:TotalEnergies老板帕特里克Pouyanne一枝独秀为了开发Tilenga

获取原文
获取原文并翻译 | 示例

摘要

TotalEnergies' annual shareholders' meeting in May may prove to be something of an ordeal for CEO Patrick Pouyanne. A growing number of shareholders have serious doubts about the development of the Tilenga project in the Lake Albert basin. Any future oil extracted from the site, which is partly located in a fragile ecosystem within the protected Murchison Falls National Park, will have to be transported via a 1,600km pipeline to the Tanzanian port of Tanga. The pipeline will need to be electrically heated to prevent the oil from solidifying, as its composition enables crude to turn to wax if the temperature is too low.
机译:5月份TotalEnergies年度股东大会可能是某种CEO折磨吗帕特里克Pouyanne。股东产生严重怀疑在湖里Tilenga项目的发展艾伯特盆地。网站部分位于脆弱生态系统内保护Murchison下跌国家公园,将会被通过坦桑尼亚的坦噶港1600公里管道。管道需要电热防止油凝固,作为它的成分使原油蜡如果温度太低了。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号