...
首页> 外文期刊>International Journal of Environmental Impacts: Management, Mitigation and Recovery >A CENTURY OF WORKS ON RIVER SEVESO: FROM UNREGULATED DEVELOPMENT TO BASIN RECLAMATION
【24h】

A CENTURY OF WORKS ON RIVER SEVESO: FROM UNREGULATED DEVELOPMENT TO BASIN RECLAMATION

机译:一个世纪的河化工厂工作:从不受监管的发展盆地复垦

获取原文
获取原文并翻译 | 示例

摘要

The story of the river Seveso is briefly presented in this article. Seveso is a small river that enters into a large city as Milano, where it flows covering a total reach of around 15 km. In the years the river produced an impressive number of floods (on average more than 2.5 per year), and no rapid solution is devised. Structural solutions have been carried out, and they are related to the construction of five storage tanks, the rehabilitation of few critical points within the covered reach of the river Seveso and the doubling of a bypass in the northern area of the province of Milano. Although it is difficult to compare the global costs to 'solve' the problem with the advantages obtained during the development of the city, in the authors' opinion the only reason for this situation is the unconsciousness of the Public Administration of that time regarding the consequences in the underestimation of the risk of floods. While structural solutions have to be quickly produced in order to alleviate the discomfort of the people living in that area, more long-term solutions should imply a change of paradigm, being mainly non-structural, more holistic and paying attention to water use and discharge destination.
机译:河流化工厂发生短暂的故事在这篇文章中。进入一个大型城市米兰,在那里流覆盖总额达到约15公里。年河产生一个令人印象深刻的数字洪水每年(平均超过2.5),没有快速的解决方案设计。被执行,和他们的解决方案相关的建设五个存储坦克、康复的几个临界点在河里化工厂和覆盖绕过北部地区的两倍米兰的省份。比较全球成本来“解决”问题中获得的优势城市的发展,在作者的观点这种情况的唯一原因公共行政的无意识那时候的后果洪水的风险的低估。结构性解决方案必须快速生产为了缓解不适的人生活在那个地区,更长期解决方案应该意味着范式的改变,主要非结构性,更全面的和注意水的使用和排放目的地。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号