...
首页> 外文期刊>Environmental Progress & Sustainable Energy >The impact of capacity and location of multidistributed generator integrated in the distribution system on electrical line losses, reliability, and interruption cost
【24h】

The impact of capacity and location of multidistributed generator integrated in the distribution system on electrical line losses, reliability, and interruption cost

机译:能力和位置的影响multidistributed发电机集成的配电系统电气线路损失,可靠性和中断成本

获取原文
获取原文并翻译 | 示例
           

摘要

The primary purpose of this article is to study the impact of distributed generator (DG) integrated into the distribution system in terms of electrical line losses, reliability and interruption cost. The single- and multi-distributed generators (DG) under this study are connected to a 22 kV distribution system of the Provincial Electricity Authority (PEA) that is a part of Thailand's distribution system. Geographic information systems data, including the lengths of the distribution line and the load locations that are key parameters of PEA, are simulated using digital simulation and electrical network calculation program (DIgSILENT). In addition, the capacity and location of DG installed into the distribution system are considered. The system average interruption frequency index (SAIFI), the system average interruption duration index (SAIDI) and the interruption cost are assessed as reliability indices by comparing the SAIFI, SAIDI, and interruption cost of the base case (without DG) and the cases of single- and multi-DGs connected to the distribution system. Moreover, the electrical line loss is considered in terms of active power line loss, which is also compared with the base case. The results can be summarized by focusing on the location of DG, the capacity of DG, the number of DG, the size of the load, and the distance to the load, which are factors capable of impacting the electrical line loss, SAIFI, SAIDI, and interruption cost. (c) 2015 American Institute of Chemical Engineers Environ Prog, 34: 1763-1773, 2015
机译:本文的主要目的是学习分布式发电(DG)的影响集成到配电系统而言电气线路损失,可靠性和中断成本。multi-distributed发电机(DG)研究连接到一个22 kV分布省级电力系统的权威(豌豆)是泰国的分布系统。包括配电线路的长度和负载位置的关键参数豌豆,使用数字仿真和模拟电网络的计算程序(DIgSILENT)。DG安装到的位置分布系统被认为是。中断频率指数(SAIFI)系统平均中断持续时间指数(说)中断成本和可靠性评估指标通过对比SAIFI说,中断成本基本情况(没有DG)和单一的情况下,multi-DGs连接分配系统。电气线路损失的有功功率损失,这也是比较基本情况。通过关注DG的位置的能力DG, DG的数量,负载的大小,和负载之间的距离因素能够影响电气线路损失,SAIFI SAIDI,中断成本。美国化学工程师学会环境34岁的食物:1763 - 1773,2015

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号