...
首页> 外文期刊>Solid Waste Report >Ohio Rebids Litter Survey Job; Budgeting Sets Timing Back
【24h】

Ohio Rebids Litter Survey Job; Budgeting Sets Timing Back

机译:俄亥俄州第二次叫牌垃圾调查工作;时间回来

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Ohio Department of Natural Resources, Division of Recycling & Litter Prevention (ODNR-DRLP) plans to conduct a statewide litter study during two seasons, fall (dry) and spring (wet). This study will be approved as two different phases. The applicant will submit a detailed proposal for each phase of the project. ODNR-DRLP will approve the consultant for each phase. The performance for the work of the individual phases must be completed within the time frames of Nov. 1, for the first phase and no later than June 1, 2004, for the second phase. The budget for this project is 100,000 dollars.
机译:俄亥俄自然资源的部门,部门回收和垃圾预防ODNR-DRLP计划进行一次全国范围内的垃圾研究期间两个赛季中,秋季(干)和春季(湿)。研究将通过两个不同的阶段。申请人将提交一份详细的提案项目的每个阶段。每个阶段的顾问。必须对个人的工作阶段11月1日的时间框架内完成第一阶段,不晚于6月1日,2004年,第二阶段。是100000美元。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号