...
首页> 外文期刊>Transactions of the Institution of Mining and Metallurgy, Section A. Mining Technology >The application of the face-perpendicular preconditioning technique for de-stressing seismically active geological structures
【24h】

The application of the face-perpendicular preconditioning technique for de-stressing seismically active geological structures

机译:face-perpendicular的应用预处理技术,减压地震活跃的地质结构

获取原文
获取原文并翻译 | 示例

摘要

A trial on de-stressing a dyke that was located 60 m ahead of mining faces was conducted through drilling face-perpendicular preconditioning holes that intersected and passed the dyke by two metres. A sticky explosive (Ug101s) with a density of 1.1 g/cc, charging amass of 30.4 kg, powder factor of 1.3 kg/tonne, with gassing gap and 5 m long tamping material were used. After detonating the holes, a small seismic magnitude was noted. As mining progressed towards the dyke and passing through the dyke, good ground conditions were observed. Numerical modelling was conducted to simulate rate of energy release (RER), major principal stress ahead of the mining faces and simulation of the ride. The results of the study showed a gradual decrease of sigma 1,RER and high possibility of large seismic events to occur when mining through the dyke and also increase in the ride at the vicinity of the dyke.
机译:审判在减压的堤坝位于60m矿业面临前通过钻井face-perpendicular预处理洞两个分割的,通过了堤坝米。密度1.1克/ cc,收取30.4公斤的积聚,1.3公斤/吨粉因素,吹嘘的差距和5米长填塞材料。引爆的洞,一个小地震震级是指出。通过堤坝,良好的地面观察条件。进行模拟的能量释放率(r),最大主应力的挖掘脸和模拟。σ的研究呈逐渐下降趋势1, r和高大型地震的可能性事件发生时通过堤坝和采矿也增加了骑的附近堤坝。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号